The Subway
verified
ACA 3B
Unknown flood risk
Logistics
| Permit | Required, verify with land manager |
|---|---|
| Distance | 9.5 mi |
| Time | 6 hr-12 hr |
| Technical | 4 rappels, longest 50 ft |
| Season | Spring; Summer; Fall |
| Vehicle access | Passenger |
| Coordinates | 37.34, -113.0756 |