Atlas › Oberwallis

Gondo

not verifiedpermit unconfirmed 2026-08-19 Ungraded Unknown flood risk Gondo, VS

Seven rappels down the Zwischbergenschlucht, the longest 50 meters, with a mandatory 1.8 km shuttle and a five hour round trip best run July through September.

Logistics

PermitRopeWiki's Red Tape section is empty and its infobox carries no Permits field, so access here is unverified rather than confirmed free. About 1.8 km of shuttle needed.
Distance620m
Time5 hr
Technical7 rappels, longest 50m
SeasonJun - Oct;BEST in Jul - Sep
Coordinates46.1897, 8.1417

Sources