Five Day Creek
verified
Ungraded
Unknown flood risk
Rough notes by Leo Tregret.
Second Section (direct walking track) * R1 25m Tree CR thru flow, onto rock ledge * R2 15m XCR thru flow into shallow pool * R3 traverse line 5m tree CR (no sling) * R4 28m XCR dry into shallow pool * CW 130m * R5 10m Tree CL dry into shallow pool * DC 5m CR, thru chimney squeeze * R6 30m XCL dry * R7 35M XXCL thru flow onto boulder. Semi hanging. * R7 40m XXCL dry onto dry ledge. * DC CL 5m * R2
Logistics
| Permit | None required |
|---|---|
| Technical | 19 rappels, longest 40m |
| Season | Oct-Apr |
| Vehicle access | Passenger |
| Coordinates | -30.51011, 152.40083 |